Evidence/London Small Sites/Islington

Islington

Small residential planning decisions from January 2023 onwards, coded from the council’s own register to the same method used in all 33 London planning authorities.

367 applications · 214 decided · 71% approved Data to Feb 2026 Release August 2026
Applications logged
367
Full, householder and minor resi since Feb 2023
Decided so far
214
153 approved, 61 refused, 46 withdrawn
Approval rate
71%
Roughly two in three decided applications
Typical time to decide
8 weeks
Median determination time across all small sites

Islington, area by area

Colour shows how often applications get approved. Numbers show how many were decided. Hover or tap an area for detail.

Angel & Barnsbury 23 Archway & Tufnell Park 6 Tollington & Junction 16 Approval rate 56% 100%
Spotlight

Angel & Barnsbury

Decisions
23
Approved
15
Refused
8
Approval rate
65%
Hover or tap any tile to see that area’s detail.
Tile positions are schematic, not to geographic scale. Each hex represents one of Islington’s sub-areas as defined in the council’s own planning framework.

Archway & Tufnell Park approves 100% of applications. Tollington & Junction, closer to 56%. Same borough, same policy, 44 percentage points of difference.

Which kinds of schemes get approved?

Bar length shows how many of each type were decided. The split shows the share approved versus refused. Conversion is by far the most common route in Islington, but it's demolish & rebuild that sees the highest approval rate.

Approved Refused Bar length = sample size (max n=107)
Conversion
65%n=107
Demolish & rebuild
94%n=51
Mid-terrace
56%n=16
Extension
73%n=15
Scheme types with fewer than 10 decisions in the window are not shown here.
Conversion, dividing one home into flats
Demolish & rebuild, existing building replaced with new homes
Mid-terrace, insertion into the middle of a terrace
Extension, rear, side or upward additions creating a new unit

Why applications fail in Islington

Of every hundred reasons cited in refused decisions in Islington, permitted development accounts for the biggest slice at 25%.

Permitted development, prior approval conditions not met 25
Space standards, unit and room sizes, ceiling heights, private outdoor space 17
Neighbour amenity, overlooking, loss of light, privacy, noise 10
Loss of existing use, commercial, employment or community floorspace 9
Policy, land use, affordable housing, principle of development 9
Other, mixed or uncategorised reasons 9
Design quality, bulk, massing, appearance, materials 7
Heritage, conservation areas, listed buildings 6
Infrastructure, drainage, energy, biodiversity 4
Insufficient information, missing reports, surveys or assessments 3
Read as: “Of every 100 reasons cited in a refusal, 25 relate to permitted development.” A single refusal often names two or more reasons. Based on 138 reasons extracted from refused decision notices.

In Islington, the most common ground for refusal is permitted development.

Is Islington getting busier?

Decisions per quarter have held roughly steady since 2023, and approval rates have drifted upward over the same window.

Decisions per quarter
Approval rate (%)
0 0% 25% 50% 75% 100% borough avg 71% '23 Q1 · 64% · n=11 '23 Q2 · 57% · n=21 '23 Q3 · 74% · n=23 '23 Q4 · 54% · n=24 '24 Q1 · 71% · n=21 '24 Q2 · 50% · n=4 '24 Q3 · 75% · n=4 '24 Q4 · 78% · n=9 '25 Q1 · 82% · n=17 '25 Q2 · 93% · n=14 '25 Q3 · 68% · n=31 '25 Q4 · 87% · n=23 '26 Q1 · 67% · n=6 '23 Q1 '23 Q2 '23 Q3 '23 Q4 '24 Q1 '24 Q2 '24 Q3 '24 Q4 '25 Q1 '25 Q2 '25 Q3 '25 Q4 '26 Q1
Hover any bar or dot for exact quarterly values. The most recent quarter may be partial while pending decisions work through.

Interrogate the data yourself

Every figure on this page comes from Islington's own planning decisions. We publish the underlying data so you can check it, replicate our findings, or use it in your own tools. Verify against the council's planning portal before relying on any record, and tell us if you spot a problem.

Decided small-site applications, 1 to 9 units. Planning-decision layer only: Energy Performance Certificate, Land Registry and case-officer fields are held back. Contains public sector information licensed under the Open Government Licence v3.0. Source: Planning London Datahub, Greater London Authority. Method.

About these figures

The figures describe decided applications for one to nine homes. They show what has happened in Islington over the period covered; they do not predict the outcome of an individual application, and no approval probability is offered for any site or scheme.

Sample sizes are shown with the findings. Where the available evidence is too thin for a result to carry meaning, it is withheld or marked accordingly.

Research using this evidence

All research →

Data sources & method

Applications. Sourced from the Greater London Authority (GLA) Planning Datahub and Islington Council’s online planning register. Covers full planning, householder, and minor residential applications of nine units or fewer decided in the window shown above.

Decisions and timing. Outcomes and determination times are taken from the council’s published decision notices.

Refusal reasons. Extracted from refused decision notices that were publicly available. Not every refusal has a readable notice, so totals count all refusals but the reason breakdown covers only those we could read.

Scheme classification. Site types (conversion, demolish & rebuild, extension, and so on) are coded from application descriptions and drawings. Areas are mapped from postcodes and ward names using the council’s own sub-area definitions.

Update frequency. Refreshed quarterly. Next refresh: October 2026.

Nothing here is planning advice. Outcomes are historical and do not predict individual cases. Approval rates vary with site specifics, policy context, and case officer. See our Terms of Use for full details on how this data is compiled and the limits of its use.