Research

Where does London’s theoretical housing capacity disappear between the rulebook and the built home?

Planning capacity is usually discussed in terms of what policy and planning documents permit. But permission on paper is only the beginning.

Between the rulebook and additional homes are several stages at which the outcome can change:

1

Nominal

What the documents permit.

2

Behavioural

What applicants still choose to submit.

3

Decision

What planning authorities consent.

4

Realised

What that consent actually adds, measured in net homes.

Most planning analysis concentrates on the first stage. Perfect Scale is currently strongest at observing the second and third. Its work on the fourth begins with what permissions add in net homes; it does not yet measure completions across the full dataset.

The distinction matters. A policy can affect development without appearing in a refusal notice. A site can retain nominal capacity while observed decision outcomes change. A permission for two homes can add only one net home if an existing dwelling is demolished.

Perfect Scale studies those observed transitions.

It does not estimate the number of homes that would have been built if unsubmitted schemes had come forward, assign approval probabilities to individual sites, or turn observed approval rates into probability-weighted housing capacity.

The current research programme asks:

  • Do new planning reforms diagnose the problem correctly? What problem do changes to national and London policy assume the small-sites market has, and does the observed record support that diagnosis?
  • What is structurally unusual about London? Why does the relationship between house prices and planning outcomes inside London differ from the relationship observed across English planning authorities?
  • Can nominal capacity remain unchanged while decision outcomes change? What can policy and design-code changes tell us about the difference between development that remains possible on paper and development that receives permission in practice?
  • What does determination time actually measure? Does the statutory eight-week measure capture administrative speed, or does it also reflect differences between schemes that are refused and schemes that remain in negotiation?
  • How do written rules become observed outcomes? What is the relationship between written policy, constraints applicants anticipate, applications actually submitted, stated reasons for refusal and eventual decisions?
  • What does a refusal mean for the site that received it? Do refused schemes appeal, return with another application or stop, and what does that tell us about whether the first decision is the end of the process or one stage within it?
  • Does an administrative boundary correspond with different observed outcomes? When similar applications close to opposite sides of a borough boundary are matched on observable characteristics, what differences remain?
  • How much housing does a permission actually add? How do gross approved units differ from net additional homes, and what does that distinction do to the way small-sites housing targets are measured?

These are research questions, not positions. Some already have substantial evidence behind them; others are designs to be tested. Findings are published with their scope, limitations and the evidence needed to support them.

AnalysisCroydonAugust 2026

What Croydon actually refuses on

Transport is Croydon’s most-cited refusal category, at 28.3% of its coded reasons against a London average of 14.8%. It is the first-listed reason in 31 of 483 refusals. Design is the leading primary ground.

AnalysisLondon-wideAugust 2026

Why we cannot tell you whether pre-application advice works

A published finding that pre-application advice helps in some boroughs and hurts in others turned out to be measuring the way the data was collected. The retraction, the artefact, and what would answer the question properly.

ResearchLondon-wideJuly 2026

The Permissive Ten: same answer, four different reasons

London’s ten most permissive small-sites boroughs approve above expectation for at least four different reasons. Only one of the four, a plan that states the encouragement in writing, is something another borough could adopt. Descriptive, not causal.

ResearchLondon-wideJuly 2026

The Most Restrictive Ten: restrictiveness is not one thing

London’s ten most restrictive small-sites boroughs approve below expectation for more than one reason. Six can point to an adopted policy that accounts for it. Four cannot, and in one of those four the adopted text says the opposite. Descriptive, not causal.

ResearchLondon-wideJuly 2026

The Middle Ten: the small number that hides the most

In the middle of the table a near-zero differential is the least informative number on the page. The same headline can sit on a twenty-percentage-point gap between one site type and another, or on almost no gap at all.

ResearchLondon-wideJuly 2026

The Affordable Ten: is the variation legitimate?

London’s ten cheapest boroughs sit inside a £107,000 band and still span forty points of small-sites outcome. Price, held in this band, does not account for the spread.

ResearchLondon-wideJuly 2026

The Least Affordable Ten: does wealth settle the outcome?

Nine of London’s ten most expensive boroughs approve small sites above expectation. The tenth, Barnet, sits below it on an adopted policy that protects family housing, which makes the price gradient a tendency rather than a rule.

AnalysisLondon-wideMay 2026

The affordable housing threshold spread across London

Camden’s affordable housing threshold is one unit. Bromley’s is eleven. The same scheme meets an eleven-fold difference in threshold depending on which side of a boundary it sits.

AnalysisLondon-wideMarch 2026

Conversion approval rates across London

Across 5,391 decided conversion applications the London-wide approval rate is 52.5%. Among boroughs with at least 30 decided conversions the range runs from 20.0% to 92.4%.

AnalysisHammersmith & FulhamMarch 2026

Why Hammersmith & Fulham takes longer to say yes

Approved applications in Hammersmith & Fulham take substantially longer to determine than refusals. The asymmetry points to negotiation rather than delay, and it has viability consequences.

AnalysisCamdenMarch 2026

Why do conservation areas boost approval rates in Camden?

Camden conservation area sites are approved at 85.4% against 55.3% outside them, a 30 percentage point gap across 240 decided small-site applications. The direction is the opposite of the usual assumption.

AnalysisLondon-wideMarch 2026

Do 6 and 9 unit schemes really get approved more often?

Six-unit schemes are refused 36.3% of the time against a London average of 45.4%. Nine-unit schemes sit at 42.8%, better than average but not by much. The six-unit gap is the finding that survives.