Evidence/London Small Sites/Merton

Merton

Small residential planning decisions from January 2023 onwards, coded from the council’s own register to the same method used in all 33 London planning authorities.

405 applications · 331 decided · 62% approved Data to Apr 2026 Release August 2026
Applications logged
405
Full, householder and minor resi since Feb 2023
Decided so far
331
206 approved, 125 refused, 1 withdrawn
Approval rate
62%
Just over half of decided applications
Typical time to decide
10 weeks
Median determination time across all small sites

Merton, area by area

Colour shows how often applications get approved. Numbers show how many were decided. Hover or tap an area for detail.

Wimbledon 107 Colliers Wood & South Wimbledon 37 Raynes Park 56 Morden 24 Mitcham 106 Approval rate 43% 82%
Spotlight

Wimbledon

Decisions
107
Approved
88
Refused
19
Approval rate
82%
Hover or tap any tile to see that area’s detail.
Tile positions are schematic, not to geographic scale. Each hex represents one of Merton’s sub-areas as defined in the council’s own planning framework.

Wimbledon approves 82% of applications. Mitcham, closer to 43%. Same borough, same policy, 39 percentage points of difference.

Which kinds of schemes get approved?

Bar length shows how many of each type were decided. The split shows the share approved versus refused. Conversion is by far the most common route in Merton, but it's end-of-terrace that sees the highest approval rate.

Approved Refused Bar length = sample size (max n=129)
Conversion
60%n=129
Demolish & rebuild
66%n=86
Mid-terrace
58%n=43
End-of-terrace
71%n=24
Extension
71%n=17
Backland
38%n=13
Mixed use
40%n=10
Scheme types with fewer than 10 decisions in the window are not shown here.
Conversion, dividing one home into flats
Demolish & rebuild, existing building replaced with new homes
Mid-terrace, insertion into the middle of a terrace
End-of-terrace, new infill at the end of a terraced row
Extension, rear, side or upward additions creating a new unit
Backland, new build on rear gardens or courtyard land
Mixed use, ground-floor commercial with homes above

Why applications fail in Merton

Of every hundred reasons cited in refused decisions in Merton, transport and parking accounts for the biggest slice at 26%.

Transport and parking, parking, highway safety, cycle storage 26
Space standards, unit and room sizes, ceiling heights, private outdoor space 15
Design quality, bulk, massing, appearance, materials 13
Infrastructure, drainage, energy, biodiversity 12
Insufficient information, missing reports, surveys or assessments 10
Neighbour amenity, overlooking, loss of light, privacy, noise 9
Flood risk 7
Loss of existing use, commercial, employment or community floorspace 2
Permitted development, prior approval conditions not met 2
Policy, land use, affordable housing, principle of development 2
Read as: “Of every 100 reasons cited in a refusal, 26 relate to transport and parking.” A single refusal often names two or more reasons. Based on 580 reasons extracted from refused decision notices.

In Merton, parking and transport concerns account for more refusals than any other reason.

Is Merton getting busier?

Decisions per quarter have fallen since 2023, and approval rates have drifted upward over the same window.

Decisions per quarter
Approval rate (%)
0 0% 25% 50% 75% 100% borough avg 62% '23 Q2 · 44% · n=18 '23 Q3 · 44% · n=25 '23 Q4 · 57% · n=37 '24 Q1 · 55% · n=31 '24 Q2 · 56% · n=25 '24 Q3 · 77% · n=43 '24 Q4 · 45% · n=31 '25 Q1 · 79% · n=34 '25 Q2 · 72% · n=25 '25 Q3 · 67% · n=18 '25 Q4 · 68% · n=19 '26 Q1 · 75% · n=8 '26 Q2 · 67% · n=6 '23 Q2 '23 Q3 '23 Q4 '24 Q1 '24 Q2 '24 Q3 '24 Q4 '25 Q1 '25 Q2 '25 Q3 '25 Q4 '26 Q1 '26 Q2
Hover any bar or dot for exact quarterly values. The most recent quarter may be partial while pending decisions work through.

Interrogate the data yourself

Every figure on this page comes from Merton's own planning decisions. We publish the underlying data so you can check it, replicate our findings, or use it in your own tools. Verify against the council's planning portal before relying on any record, and tell us if you spot a problem.

Decided small-site applications, 1 to 9 units. Planning-decision layer only: Energy Performance Certificate, Land Registry and case-officer fields are held back. Contains public sector information licensed under the Open Government Licence v3.0. Source: Planning London Datahub, Greater London Authority. Method.

About these figures

The figures describe decided applications for one to nine homes. They show what has happened in Merton over the period covered; they do not predict the outcome of an individual application, and no approval probability is offered for any site or scheme.

Sample sizes are shown with the findings. Where the available evidence is too thin for a result to carry meaning, it is withheld or marked accordingly.

Research using this evidence

All research →

Data sources & method

Applications. Sourced from the Greater London Authority (GLA) Planning Datahub and Merton Council’s online planning register. Covers full planning, householder, and minor residential applications of nine units or fewer decided in the window shown above.

Decisions and timing. Outcomes and determination times are taken from the council’s published decision notices.

Refusal reasons. Extracted from refused decision notices that were publicly available. Not every refusal has a readable notice, so totals count all refusals but the reason breakdown covers only those we could read.

Scheme classification. Site types (conversion, demolish & rebuild, extension, and so on) are coded from application descriptions and drawings. Areas are mapped from postcodes and ward names using the council’s own sub-area definitions.

Update frequency. Refreshed quarterly. Next refresh: October 2026.

Nothing here is planning advice. Outcomes are historical and do not predict individual cases. Approval rates vary with site specifics, policy context, and case officer. See our Terms of Use for full details on how this data is compiled and the limits of its use.